A paver patio is three layers: gravel base, sand bed, and pavers on top. The Paver Calculator works out all three from two measurements — the patio area and the size of one paver — and this guide covers every input, every common paver size, and the choices that change the answer.
At a glance
The three inputs
First, the patio area in square metres: length times width in metres, with L-shaped patios split into rectangles and added together. Second, the paver length in centimetres. Third, the paver width in centimetres. That is all the tool asks for. There is no box for the waste allowance, because the tool adds 5% itself, and no box for the base or sand depths, because the tool uses 100 mm of base and 30 mm of sand.
Common paver sizes and what they cover
A 20 cm by 20 cm paver covers 0.04 square metres. A 200 mm by 100 mm paver covers 0.02 square metres, half as much. A 300 mm by 300 mm paver covers 0.09 square metres, more than twice as much as the 20 cm square. For the same 20 square metres, the counts are 525, 1,050 and 234: 20 ÷ 0.02 = 1,000, times 1.05 is 1,050 for the small rectangular paver, against 234 for the large square one. Bigger pavers mean fewer pavers and fewer joints, but each one is heavier to carry and cut.
Worked example: an 18 square metre patio with large pavers
An 18 square metre patio with 300 mm by 300 mm pavers needs 18 ÷ 0.09 = 200 pavers before waste, and 200 × 1.05 = 210 pavers with the 5% allowance. The base is 18 × 0.10 = 1.8 cubic metres and the sand is 18 × 0.03 = 0.54 cubic metres. The same patio with 200 mm by 100 mm pavers would need 18 ÷ 0.02 = 900 pavers, times 1.05 is 945 — more than four times as many, for the same ground.
Another example: a 25 square metre patio with small pavers
A 25 square metre patio with 200 mm by 100 mm pavers needs 25 ÷ 0.02 = 1,250 pavers before waste, and 1,250 × 1.05 = 1,312.5, which rounds up to 1,313 pavers. The base is 25 × 0.10 = 2.5 cubic metres and the sand is 25 × 0.03 = 0.75 cubic metres. This is the kind of count where ordering by hand is easy to get wrong by a hundred, so check it against the tool before you pay.
Waste: when 5% is enough and when it is not
Five percent fits a rectangular patio laid in straight rows. A patio with curves, a diagonal pattern, or many corners wastes more, and 10% is the safer figure there. On the 20 square metre example, 10% gives 500 × 1.10 = 550 pavers instead of 525, which is 25 more. The tool gives the 5% figure; add the extra yourself for an awkward shape, and keep a few spares for later repairs, because a matching batch may not be in stock in a year’s time.
Base and sand, and what the tool does not cover
The base is 100 mm deep and the sand is 30 mm deep, which suits a patio walked on by people. A driveway needs a deeper base — check local guidance before ordering for one. The tool does not include jointing sand, which is brushed into the gaps after laying and is a small extra amount on top of the bedding sand. It also counts pavers as if they are laid edge to edge; wide joints change the count a little, and the 5% allowance covers that in most cases.
The common mistake
People pick a paver size from a picture and guess the count from a different size. The count follows the paver area exactly: halve the paver area and the count doubles, as the 0.02 and 0.04 square metre pavers show for the same 20 square metres — 1,050 against 525. Measure the paver you are actually buying, type that size in, and the count will be right.
Frequently asked questions
What does the Paver Calculator work out?
How many pavers to order, how much base gravel, and how much bedding sand, from the patio area and the size of one paver.
How many pavers for 25 m² with 200 × 100 mm pavers?
1,313 pavers. The bare count is 25 ÷ 0.02 = 1,250, and 5% extra is 1,312.5, which rounds up to 1,313.
How many pavers for 18 m² with 300 × 300 mm pavers?
210 pavers. The bare count is 18 ÷ 0.09 = 200, and 5% extra makes 210.
How many pavers for 20 m² with 200 × 100 mm pavers?
1,050 pavers. The bare count is 20 ÷ 0.02 = 1,000, and 5% extra makes 1,050.
Does the tool include jointing sand?
No. Jointing sand is brushed into the gaps after laying and is a small extra amount on top of the bedding sand.
More guides on the Paver Calculator
- How to use the Paver Calculator — step by step
- Paver Calculator explained with worked examples
- Paver Calculator formula — how it actually works
- Paver Calculator for beginners — start here
- Common mistakes people make with the Paver Calculator
- Paver Calculator vs doing it by hand — which is faster?
- How to get an accurate result from the Paver Calculator
- Paver Calculator for students — with examples
- Paver Calculator for homeowners and DIYers
Try the Paver Calculator — free, in your browser.