Round the house, the same question keeps coming up: how many pavers, how much gravel, and how much sand do I need, and what will it cost? The Paver Calculator answers the first three in one pass, and this guide shows how to turn those answers into an order, a budget, and a weekend plan.

At a glance

525 pavers on a 0 to 600 scale0 pavers300 pavers600 pavers20 m² with 20 × 20 cm pavers = 525 pavers
525 pavers sits close to the top of a 0 to 600 scale, which is the count for a 20 square metre patio with 20 by 20 centimetre pavers.

Start with the patio you actually have

Measure the patio in metres and work out the area. A patio 5 metres by 4 metres is 20 square metres. With 20 cm by 20 cm pavers at 0.04 square metres each, the bare count is 20 ÷ 0.04 = 500 pavers, and with 5% extra for cuts that is 525 pavers. The base is 20 × 0.10 = 2 cubic metres of gravel and the sand is 20 × 0.03 = 0.6 cubic metres. Those three numbers — 525 pavers, 2 cubic metres of gravel, 0.6 cubic metres of sand — are the whole order for a straightforward patio.

Turning the count into a cost

Multiply the paver count by the price of one paver to get the paver cost. If pavers cost ₹40 each, 525 pavers cost 525 × 40 = ₹21,000. The same check works for any price: at ₹60 each the same patio costs 525 × 60 = ₹31,500. Get the price from the supplier you will actually buy from, because paver prices vary a lot by size, colour and finish, and the tool does not set prices. Add the gravel and sand on top, and ask the supplier whether delivery is included, because a second delivery for forgotten sand costs as much as the sand itself.

A smaller job: a garden path

Not every job is a full patio. A path 1.2 metres wide and 5 metres long is 1.2 × 5 = 6 square metres. With 20 cm by 20 cm pavers the bare count is 6 ÷ 0.04 = 150 pavers, and with 5% extra that is 150 × 1.05 = 157.5, which rounds up to 158 pavers. The base is 6 × 0.10 = 0.6 cubic metres and the sand is 6 × 0.03 = 0.18 cubic metres. A path like this is a good first DIY job: it uses the same three layers as a patio, but it is small enough to finish in a weekend.

Comparing two paver sizes before you buy

Before you order, try both sizes in the tool. For the same 20 square metres, 200 mm by 100 mm pavers need 20 ÷ 0.02 = 1,000 pavers before waste, which is 1,050 with 5% extra, while 300 mm by 300 mm pavers need only 234. The small pavers give a finer pattern and more joints to fill, and each one is light to carry; the large pavers lay faster and need fewer joints, but each one is heavier and harder to cut. The base and sand stay the same either way — 2 cubic metres and 0.6 cubic metres — because they depend on the area, not the paver.

Ordering and keeping spares

Order the count the tool gives, including the 5% allowance, and keep the spares for later repairs. A curved edge, a diagonal pattern, or a patio with many corners wastes more than a straight rectangle, so for those shapes order nearer 10% extra: on the 20 square metre patio that is 500 × 1.10 = 550 pavers instead of 525. Buy all the pavers in one batch if you can, because a second batch may be a slightly different shade, and that shows on a patio.

What the tool does not do for you

The tool gives quantities, not a building plan. It does not include jointing sand, which is brushed into the gaps after laying. It uses 100 mm of base and 30 mm of sand, which suits a patio walked on by people; a driveway needs a deeper base, so check local guidance before ordering for one. And it counts pavers as if they are laid edge to edge, so if your joints are wide, the count will be a little high — the 5% allowance covers that in most cases, and a few spares are never wasted.

The common mistake

Homeowners often order the bare count and run short at the last row, then find the matching batch is gone. For the 20 square metre patio the bare count is 500 and the tool gives 525 — 25 pavers short is most of a row, and a half-finished patio cannot be used while you wait for a delivery. Order the tool’s number, keep the spares, and check the answer backwards: 525 × 0.04 = 21 square metres, which is 20 square metres plus 5% — exactly right.

Frequently asked questions

How many pavers do I need for a 20 m² patio?

525 pavers with 20 × 20 cm pavers. The bare count is 20 ÷ 0.04 = 500, and 5% extra for cuts makes 525.

How much would 525 pavers cost?

It depends on the price per paver. At ₹40 each, 525 pavers cost ₹21,000; at ₹60 each they cost ₹31,500. Get the price from your supplier.

How many pavers for a 1.2 × 5 m path?

158 pavers with 20 × 20 cm pavers. The area is 6 m², the bare count is 150, and 5% extra is 157.5, which rounds up to 158.

Should I keep spare pavers?

Yes. Order the tool’s count including the 5% allowance, and keep the spares for later repairs, because a matching batch may not be in stock later.