Paver Calculator formula — how it actually works

WhiteUI · A plain-English guide to the Paver Calculator

Every answer on the Paver Calculator comes from one short formula and two fixed depths. The formula works out how many pavers cover the patio, adds 5% for cuts and breakage, and rounds the result up to a whole paver. The base gravel is the area times 100 mm deep, and the bedding sand is the area times 30 mm deep. There is nothing else hidden in the maths.

Paver area = length × width (in metres)
Pavers = ceil(area ÷ paver area × 1.05)
Base = area × 0.10 m, Sand = area × 0.03 m

At a glance

5% extra for cuts and breakage25 extra pavers500 pavers to cover the area25 out of 525 pavers is the 5% allowance
Out of 525 pavers for a 20 square metre patio, 25 are the 5 percent allowance for cuts and breakage and 500 cover the area itself.

Step one: the area of one paver

Change the paver length and width from centimetres into metres, then multiply them. A 20 cm by 20 cm paver is 0.20 × 0.20 = 0.04 square metres. A 200 mm by 100 mm paver is 0.20 × 0.10 = 0.02 square metres. A 300 mm by 300 mm paver is 0.30 × 0.30 = 0.09 square metres. This one number decides the whole count, so getting it right matters more than anything else.

Step two: divide and add 5%

Divide the patio area by the paver area to get the bare count, then multiply by 1.05 to add 5% for cuts and breakage. For a 10 square metre patio with 20 cm by 20 cm pavers, that is 10 ÷ 0.04 = 250 pavers, then 250 × 1.05 = 262.5, which the tool rounds up to 263 pavers. The rounding up is the “ceil” in the formula: a part paver still has to be bought as a whole paver.

Step three: base gravel and bedding sand

The base is 100 mm deep, so its volume is the area times 0.10 metres. The sand is 30 mm deep, so its volume is the area times 0.03 metres. For the same 10 square metre patio that is 10 × 0.10 = 1 cubic metre of base gravel and 10 × 0.03 = 0.3 cubic metres of bedding sand. These depths suit a patio used on foot; a driveway needs a deeper base, and the tool does not set that depth for you.

Worked example: a 15 square metre patio

Take a patio 5 metres by 3 metres, which is 15 square metres, with 200 mm by 100 mm pavers at 0.02 square metres each. The bare count is 15 ÷ 0.02 = 750 pavers, and with 5% extra that is 750 × 1.05 = 787.5, which rounds up to 788 pavers. The base is 15 × 0.10 = 1.5 cubic metres and the sand is 15 × 0.03 = 0.45 cubic metres.

Why 5% and not 10%

Five percent covers a simple rectangular patio laid in straight rows, where most cuts happen only at the edges. A curved patio, a diagonal pattern, or a patio with many corners wastes more, and for those jobs 10% is the safer allowance. On the 20 square metre example, 10% would give 500 × 1.10 = 550 pavers instead of 525, which is 25 more pavers. The tool uses 5% because that fits the common case, and you can add more yourself for an awkward shape.

The common mistake

People leave out the 5% and order the bare count, then run short at the last row. For the 10 square metre example the bare count is 250 and the tool gives 263 — 13 pavers short if you order the bare number, and 13 pavers is most of a row. Always order the count with the allowance included, and keep a few spares for later repairs.

Frequently asked questions

What is the Paver Calculator formula?

Pavers = ceil(area ÷ paver area × 1.05), where paver area is length × width in metres. Base = area × 0.10 m and sand = area × 0.03 m.

How many pavers for 10 m² with 20 × 20 cm pavers?

263 pavers. The bare count is 10 ÷ 0.04 = 250, and 5% extra is 262.5, which rounds up to 263.

How much base and sand for 10 m²?

1 cubic metre of base gravel and 0.3 cubic metres of bedding sand.

Why does the tool add 5%?

To cover pavers cut at edges and around curves, and a few that break. A simple rectangular patio needs about 5%; a curved or diagonal one needs more, nearer 10%.