← All tools/Tools/Garden & Outdoor/Fire Pit Calculator

Fire Pit Calculator

Work out how many blocks a round fire pit needs, plus the gravel base and lava rock fill.

in
in
in
rings
in
in

Blocks to buy (with 10% extra)

33 blocks

10 per ring × 3 rings · 24 in wall

Per ring
10
Total
30
To buy
33
Breakdown
Blocks per ring10
Total blocks30
Blocks to buy (+10%)33
Total wall height24 in (2 ft)
Gravel base volume2.36 cu ft
Lava rock fill volume3.53 cu ft

How it works

Blocks per ring = ceil(π × inner diameter ÷ block length)
Total blocks = blocks per ring × number of rings
Blocks to buy = ceil(total × 1.10) for breakage
Wall height = rings × block height
Gravel volume (cu ft) = π × radius² × base depth ÷ 1728
Fill volume (cu ft) = π × inner radius² × fill depth ÷ 1728
Note: 1728 is the number of cubic inches in a cubic foot (12³). Dividing by 12 alone mixes inches with feet and understates the volume by 12×.

A 36 in diameter pit with 12 in blocks and 3 rings: circumference π × 36 = 113.1 in, so 10 blocks per ring, 30 in total, 33 with 10% extra. A 4 in gravel base needs π × 18² × 4 ÷ 1728 = 2.36 cu ft, and 6 in of lava rock fill needs π × 18² × 6 ÷ 1728 = 3.53 cu ft. The wall is 3 × 8 = 24 in high.

Frequently asked questions

Why divide by 1728 and not 12?

The radius and depth are in inches, so π × radius² × depth gives cubic inches. A cubic foot holds 12 × 12 × 12 = 1728 cubic inches, so you divide by 1728. Dividing by 12 alone would give a number 12 times too small.

Why buy 10% extra blocks?

Blocks chip, crack or cut badly, and dye lots vary between batches. Buying 10% extra covers breakage and leaves spares that match if a block ever needs replacing.

How many rings high should a fire pit be?

Three rings (about 24 in with 8 in blocks) is a comfortable height for most pits — high enough to contain the fire, low enough to see over. Two rings suits a low pit; four or more needs adhesive between rings.

What goes under the fire pit?

A 4 in layer of compacted gravel under the pit floor drains water and stops the blocks sinking. Do not use concrete as the floor — trapped heat and moisture can crack it.

What is lava rock fill for?

Lava rock sits on the pit floor under the fire. It spreads the heat, protects the base, and looks better than bare gravel. About 4–6 in deep is enough for most pits.

More tools

Tell us what you think

Loving this tool, or stuck on something? Tell us — it takes a minute.

We’ll only use your name and email to reply if needed. The tool and page are filled in for you.