← All blog posts

How to calculate cricket run rate

WhiteUI · A plain-English guide to the Cricket Run Rate Calculator

Run rate is the simplest number in cricket: how many runs a team scores per over. It tells you at a glance whether an innings is flying or crawling, and it is the number every chase is judged against. You need only two figures to work it out, and the whole calculation is one division. The Cricket Run Rate Calculator does the same sum for you, but knowing the steps means you can check its answer and work one out from a scoreboard in seconds.

Three boxes: 180 runs, 20 overs, run rate 9.00
180 runs in 20 overs is a run rate of 9.00: divide the runs by the overs.

The formula

Run rate equals runs divided by overs. That is all there is to it:

Run rate = runs ÷ overs

The answer is written to two decimal places, so a rate of exactly 9 is shown as 9.00. Take 180 runs in 20 overs: 180 ÷ 20 = 9.00. Take 250 runs in 50 overs: 250 ÷ 50 = 5.00. The first innings scored much faster, even though the second one made more runs in total. That is the point of the rate: it strips away the length of the innings and leaves only the speed of scoring.

Step 1: count the runs

Use the team’s total as it stands on the scoreboard, including extras. Wides, no-balls, byes and leg-byes all count as runs, because they all add to the total the other side has to chase. If a team is 96 for 2, the runs figure is 96. The wickets do not enter the calculation at all: a side on 96 for 2 and a side on 96 for 8 have exactly the same run rate if they have faced the same number of overs.

Step 2: work out the overs

This is the step where most mistakes happen, because cricket writes overs in a way that looks like a decimal but is not one. An over has six balls, so the number after the point is a count of balls, from 0 to 5. The figure 15.3 means 15 overs and 3 balls, which is 93 balls, or 15.5 overs as a real number. To convert, turn the overs into balls first: 15 × 6 + 3 = 93 balls, then divide by 6 to get 15.5 overs. Only then do you divide the runs.

Worked example

A team has scored 120 runs in 15.3 overs. First convert the overs: 15 overs and 3 balls is 93 balls, and 93 ÷ 6 = 15.5 overs. Then divide: 120 ÷ 15.5 = 7.74. The run rate is 7.74. Try the same sum with a full number of overs to see the pattern: 96 runs in 12 overs is 96 ÷ 12 = 8.00, and 210 runs in 40 overs is 210 ÷ 40 = 5.25. In each case the method is identical: runs divided by overs, with the overs converted from balls first.

The common mistake

The most common mistake is dividing by the overs figure as if it were a decimal. For 120 runs in 15.3 overs, that wrong sum is 120 ÷ 15.3 = 7.84, which is higher than the true rate of 7.74. The error is small, but it is an error, and it grows when more balls have been bowled: 86 runs in 10.4 overs is 86 ÷ 10.667 = 8.06, not 86 ÷ 10.4 = 8.27. If your answer looks a little too high, check the overs conversion first: the part after the point is balls, and each ball is one sixth of an over, not one tenth. A quick check helps: multiply your answer by the overs and you should get back to the runs — 7.74 × 15.5 = 119.97, or 120 to the nearest run, which is the total you started with.

Frequently asked questions

What two numbers do I need?

The runs scored and the overs played. Divide the runs by the overs, converting the overs to balls first if there is a part over.

Why is 15.3 overs not 15.3 as a decimal?

Because the .3 means 3 balls, not three tenths of an over. 15.3 overs is 93 balls, which is 15.5 overs as a real number.

Do wickets affect the run rate?

No. The run rate uses only runs and overs. A team on 96 for 2 and a team on 96 for 8 have the same run rate after the same number of overs.

How is the run rate usually written?

To two decimal places, so 9 is written as 9.00 and 7.7419 is written as 7.74.

More guides on the Cricket Run Rate Calculator

Try it yourself

Try the Cricket Run Rate Calculator — free, in your browser.

Open the Cricket Run Rate Calculator