Around the house, ratios hide in three jobs: thinning paint, mixing concrete, and reading a plan. Get the ratio right and the job works; get it wrong and the paint peels or the concrete crumbles. The Ratio Calculator handles the two-part jobs, and the three-part ones follow the same rule by hand.

Paint — a 1:4 mix

Thinning paint 1 part paint to 4 parts water gives 5 parts in all. For 5 litres of thinned paint, each part is 1 litre: 1 litre of paint and 4 litres of water. Need 10 litres? Each part is 2 litres, so 2 litres of paint and 8 litres of water.

1:4 mix, 5 litres → 1 litre paint, 4 litres water
1:4 mix, 10 litres → 2 litres paint, 8 litres water

Concrete — 1:2:4

General-purpose concrete is 1 part cement, 2 parts sand and 4 parts aggregate. The parts add to 7, so for 350 kg of mix each part is 350 ÷ 7 = 50 kg: 50 kg of cement, 100 kg of sand and 200 kg of aggregate. Order matters here — 1:2:4 is always cement : sand : aggregate.

Plans — a 1:50 scale

On a 1:50 plan, multiply every measurement by 50. A wall drawn 2 cm long is 2 × 50 = 100 cm in real life — 1 m. A 4 cm line on the paper is a 2 m wall. Measure the plan, multiply, and you have the room.

At a glance

Concrete 1:2:4 — 350 kg in total50 kg cement100 kg sand200 kg aggregate7 parts, 50 kg each.

Concrete mix bar: 50 kg cement, 100 kg sand and 200 kg aggregate

The mistake to avoid

Mixing up the order. In 1:2:4, the numbers are cement, sand and aggregate, in that order. Swap the sand and the aggregate and you pour a mix that is mostly stone and short on sand — weak, hard to work, and likely to crack. Read the ratio left to right, and match each number to its material before you start weighing.

Ratio, percentage or scale — picking the form that fits the job

Paint tins, concrete bags and house plans all use ratios, but they ask for them in different forms. A tin that says “thin 1:4” wants a ratio: 1 part paint to 4 parts water. For 8 litres of thinned stain at 1:3, the parts add to 4, so each part is 2 litres — 2 litres of stain and 6 litres of water. A tin that says “add 25% water” means the same thing written another way: 25 parts of water in 100 parts of mix is 1 part water to 3 parts paint. And a plan marked 1:50 is a ratio used backwards: multiply the drawing by 50 instead of dividing anything.

The form to use follows the job. Mixing and diluting want a ratio, because you are measuring two things against each other. A percentage suits a label, because “25% water” is quicker to read than “1 part water to 3 parts paint”. A scale suits a drawing, because it turns centimetres on paper into metres in the room. When the tin gives a percentage, convert it to a ratio before you pour — 25% water is 1:3, not 1:4, and that one-part difference is the difference between paint that flows and paint that runs.

What to check before you mix or cut

Check the total first. In a 1:2:4 concrete mix the parts add to 7, so for 140 kg of mix each part is 20 kg: 20 kg of cement, 40 kg of sand and 80 kg of aggregate, and 20 + 40 + 80 = 140 kg. If your parts do not add up to the total, one of them is wrong. Check the units next: every part in the same unit, kilograms with kilograms and litres with litres, never mixed. Check the order, because 1:2:4 is cement, sand and aggregate in that order — swap two and the mix is wrong even though the numbers are right.

Finally, test small before you commit. Mix a trial litre of thinned paint and check it flows; pour a trial batch of concrete and check it sets. A mistake in a litre costs a litre; a mistake in a whole wall costs a wall. Measure twice, mix once, and keep the ratio written down where you can see it while you work — most mixing mistakes happen after the first bucket, when the ratio is being remembered instead of read.

Frequently asked questions

How much paint do I mix for 5 litres at 1:4?

1 litre of paint and 4 litres of water. The ratio has 5 parts, so each part is 1 litre.

What does 1:2:4 mean for concrete?

1 part cement, 2 parts sand, 4 parts aggregate. For 350 kg that is 50 kg, 100 kg and 200 kg.

How do I read a 1:50 plan?

Multiply every measurement by 50. A 2 cm line on the plan is 100 cm — 1 m — in the room.

Can the calculator split a three-part mix?

It takes two parts at a time. Add the parts yourself — 1 + 2 + 4 = 7 — divide the total by 7, then multiply by each part.

More guides on the Ratio Calculator